Dump Site/StockYard Development
- Storage of Pipes (Gas line, Crude line, Waterline, etc.)
Land Searching | Identify Land as required and visited to Client |
Levelling/Cleaning | Area to be cleaned of all shrubs & Bushes & Levelling |
Land Filling | As per required (If needed) |
Drainage | Water Drainage around periphery (If required) |
Entrance/ Approach Road | Road duly compacted and made by Broken Bricks, Stone, Moram etc. & RCC Hume pipe as per requirement (If required) |
Internal Road | Temporary / Internal Road made by Broken Bricks, Bolder Stone Etc. at dump yard to frequently inward & outward of Vehicles |
Sandrow | Soil mount height with covering plastic sheet and stacking sand bags on top |
Pipe Stopper | Each Stopper 50x50x5 mm angle/ pole covered with rubber or soft material & 6ft length (If required) |
Fencing | Using angle & Barbed wire |
Light Pole | Light poles MS pipe/ cement pole with Led flood Light complete with all cabling & fitting |
Power Back up | DG Set 7.5 KVA & 10hp engine/ Elect. Connection |
Security Cabin | Cabin for security with safety tools |
Office Cabin | Cabin for office with all setup as computer, furniture, Table, Chair, Almira etc., Stock Board, Safety board, thickness board etc., First aid Kit etc |
Driver Shed | Cabin for Driver rest room (If required) |
Toilet/washroom | Each with water facility & fittings |
Barrier Gate | Boom Barrier Gate 10m Long |
CCTV Camera | Digital Camera with all setup (If required) |