Dump Site/StockYard Development
- Storage of Pipes (Gas line, Crude line, Waterline, etc.)
| Land Searching | Identify Land as required and visited to Client |
| Levelling/Cleaning | Area to be cleaned of all shrubs & Bushes & Levelling |
| Land Filling | As per required (If needed) |
| Drainage | Water Drainage around periphery (If required) |
| Entrance/ Approach Road | Road duly compacted and made by Broken Bricks, Stone, Moram etc. & RCC Hume pipe as per requirement (If required) |
| Internal Road | Temporary / Internal Road made by Broken Bricks, Bolder Stone Etc. at dump yard to frequently inward & outward of Vehicles |
| Sandrow | Soil mount height with covering plastic sheet and stacking sand bags on top |
| Pipe Stopper | Each Stopper 50x50x5 mm angle/ pole covered with rubber or soft material & 6ft length (If required) |
| Fencing | Using angle & Barbed wire |
| Light Pole | Light poles MS pipe/ cement pole with Led flood Light complete with all cabling & fitting |
| Power Back up | DG Set 7.5 KVA & 10hp engine/ Elect. Connection |
| Security Cabin | Cabin for security with safety tools |
| Office Cabin | Cabin for office with all setup as computer, furniture, Table, Chair, Almira etc., Stock Board, Safety board, thickness board etc., First aid Kit etc |
| Driver Shed | Cabin for Driver rest room (If required) |
| Toilet/washroom | Each with water facility & fittings |
| Barrier Gate | Boom Barrier Gate 10m Long |
| CCTV Camera | Digital Camera with all setup (If required) |